Practice Exam 1 - Project 6¶
Rock Crawling¶
The city of Moab host various Rock Crawling events. You have been tasked with tracking successful attempts.
Task 1¶
Enable the Total Row for the table located on the Qtr 1 worksheet.
Hint
-
On the Qtr 1 worksheet, click on any cell in the table to select the table.
-
On the Table Tools Design tab, in the Table Style Options group, click the Total Row to enable it.
Task 2¶
On the Qtr 1 worksheet, in the Maximum row, insert a formula in column B that returns the greatest number of successful attempts for the month of January.
Hint
-
On the Qtr 1 worksheet, select the cell in the Maximum row, column B. (This will be B16 if you have not done Task 1 and B17 if you have.)
-
Click the Formulas tab.
-
In the Function Library group, click the AutoSum down-arrow and select MAX.
-
Above the worksheet, in the Formula Bar, adjust the selected cell range to include only cells B10:B14.
-
Press the Enter key to accept the formula and calculate the results.
(Hint: the result displayed should be 632.00)
Task 3¶
On the Qtr 1 worksheet, use the data contained only in the Trail, Jan, Feb and Mar columns to create a 3-D Clustered Column chart. Do not include Total data. Position the new chart to the right of the table.
Hint
-
On the Qtr 1 worksheet, select cell range A9:D14.
-
Click the Insert tab.
-
In the Charts group, click the Insert Column Chart icon and select 3-D Clustered Column.
-
Click-drag the new chart and position it to the right of the table.
Task 4¶
On the Qtr 2 worksheet, create a table from cell range A9:E14 by applying Table Style Medium 18. Use the data in row 9 as headers.
Hint
-
On the Qtr 2 worksheet, select cell range A9:E14.
-
On the Home tab, in the Styles group, click Format as Table to open the gallery.
-
Under the Medium section, click Table Style Medium 18.
-
In the Format As Table pop-up window, do the following:
a. Confirm the data field contains =$A$9:$E$14.
b. Confirm the My table has headers box is enabled.
c. Click OK.
Task 5¶
Apply Style 3 to the pie chart on the Qtr 2 worksheet.
Hint
-
On the Qtr 2 worksheet, click anywhere on the chart to select it.
-
On the Chart Tools Design tab, in the Chart Styles group, click the More drop-down arrow to open the Chart Styles gallery.
-
Select Style 3.